Loading ...
Loading ...
Loading ...
9
XBR 95 STEP TWO
HARDWARE FOR STEP 2
PART TYPE DESCRIPTION QTY
68 BOLT
5/16”XUNC18X5/8”
8
76 FLAT WASHER
Ø5/16” × Ø18 × 1.5T
6
82 SPLIT WASHER
5/16”X1.5T
2
83 CURVED WASHER
Ø5/16” × 19 × 1.5T
2
99 PHILLIPS HEAD SCREW
M5 × 12mm
4
1. Gather HARDWARE FOR STEP 2.
2. Slide the COMPUTER CABLE (44),
HANDLEBAR RESISTANCE CONTROL
CABLE (148), and HAND PULSE CABLE
(45) through the bottom of the CONSOLE
MAST COVER (31) and then the bottom of
the CONSOLE MAST (2). Make sure the
Console Mast Cover is correctly oriented (see
illustration).
3. Install the CONSOLE MAST (2) into the
receiving tube (make sure not to pinch cables;
damage to the electronics could occur) of the
MAIN FRAME (1). Insert 2 BOLTS (68) and
2 FLAT WASHERS (76) on each side. Insert
2 BOLTS and 2 CURVED WASHERS (83)
on the front. Tighten all 6 bolts rmly with the
WRENCH (112).
Continued on next page...
Loading ...
Loading ...
Loading ...