Samsung AC078BNPDBC/TC 8.0 HP Floor Standing Inverter

User Manual - Page 61

For AC078BNPDBC/TC. Also, The document are for others Samsung models: AC078BNPDBC

PDF File Manual, 76 pages, Read Online | Download pdf file

AC078BNPDBC/TC photo
Loading ...
Loading ...
Loading ...
61
English
INSTALLATION PARTS
Gas leak tests on the outdoor unit is done initially from the factory, but you must test for gas leakage after
the installation.
1 Purge the pipe and run vacuum test. (Pressure should not increase for a minute.)
2 Insert the nitrogen gas so that pressure reaches minimum 2kg/cm2.
3 Use soap water to check the leakage on the connection part.
4 For final vacuum test, leave the outdoor unit for 24 hours under pressure of 28kg/cm2 and check for any
signs of pressure decrease.
5 Discharge the nitrogen gas.
6 Keep the outdoor unit in vacuum status.
7 If length of the pipe exceeds the standard length, charge additional refrigerant.
8 Open the outdoor unit valve and circulate the refrigerant to the indoor unit so that pressure of the entire
pipe becomes even.
Gas leak test and vacuum drying
ki]_TXX^ZXjTWWpiptwhjGz{jluUGGG]X YWYYTW[TW_GGG㝘㤸G`aXYa\W
Loading ...
Loading ...
Loading ...