Samsung AC078BNPDBC/TC 8.0 HP Floor Standing Inverter

User Manual - Page 41

For AC078BNPDBC/TC. Also, The document are for others Samsung models: AC078BNPDBC

PDF File Manual, 76 pages, Read Online | Download pdf file

AC078BNPDBC/TC photo
Loading ...
Loading ...
Loading ...
41
English
INSTALLATION PARTS
The machine shall be installed on the ground or on the high platform
As shown in Figure 1, to ensure the shadow part is on the bearing surface without suspension.
As shown in Figure 1, the four installation footings shall be firmly fastened on the base platform by the
bolts (preparing four sets of M10 bolts with fitful nuts and washer which are used on site)
In order to reduce the vibration of the noisemeter, the vibration absorber (offer on site) shall be used
between the contact of machine and base platform.
It is optimal that anchor bolt is 20mm above the surface. (See Figure 2)
The base of the outdoor unit and the position of foundation bolts
Position of the foundation bolts (Ø12.0 Hole 4Points) Unit : mm
Bearing surface
>100
103.2
464
620
>90
>90
520
Ľ
Ground plane
20
Figure 1 Figure 2
Please ensure the shadow part in Figure 1 is really installed on the bearing surface without any
suspension.
The ground base that is larger than the standing leg of the air-conditioner (90mm in width and 520mm
in length) shall be used to support the air-conditioner (See Figure 1), and the rubber mat shall be fully
placed on the whole bearing surface.
The base platform shall be at least 150mm above the ground.
CAUTION
When the grounding pipe comes out from the below,
please reserve the place for the connection pipe.
The installation mode mentioned above shall ensure
that the shadow part in Figure 1 is really on the
installation surface.
ki]_TXX^ZXjTWWpiptwhjGz{jluUGGG[X YWYYTW[TW_GGG㝘㤸G`aXYa[_
Loading ...
Loading ...
Loading ...