Kolpak KF8-0812-FR Walk-In Freezer 8'-6.25" H, 7'-9" W, 11'-7" L with Era floor

Installation operation - Page 8

For KF8-0812-FR.

PDF File Manual, 37 pages, Read Online | Download pdf file

KF8-0812-FR photo
Loading ...
Loading ...
Loading ...
www.kolpak.com 800-225-9916 8
Scan the QR Code below to view Operating The Cam Lock Service Video.
CAUTION
Using a hammer to drive the hex wrench into the panel fastener can result in damaging
the interface surface, rendering the lock unusable. Clear the hole of any debris if the
wrench cannot be fully inserted with normal hand pressure.
General Installation Guidelines
All insulated panels have a tongue and a groove perimeter edge. This interlocking
design and the panel edge gaskets will result in an air-tight walk-in when installed
square and level. Refer to the assembly drawing for the general layout and specific
panel placement and markings.
The tongue side of the panel and cam lock holes is on the left of each seam when
viewed from the interior of the walk-in (standing on the inside and looking out). The
exact location of the tongue (M) and groove (F) for ceiling and floor panels, if required,
will be shown on the assembly drawing.
Loading ...
Loading ...
Loading ...