Kolpak KF8-0812-FR Walk-In Freezer 8'-6.25" H, 7'-9" W, 11'-7" L with Era floor

Installation operation - Page 17

For KF8-0812-FR.

PDF File Manual, 37 pages, Read Online | Download pdf file

KF8-0812-FR photo
Loading ...
Loading ...
Loading ...
www.kolpak.com 800-225-9916 17
WARNING
The top panels on walk-in units are designed, at a minimum, for an allowable live load
of ten pounds per square foot as noted on submittal drawings and installation
instructions. Top panels are not designed as work platforms or for dry storage and
should not be used as such. Use in such a manner could damage the structural
integrity of the top panels and will void the manufacturer’s warranty. Do not place
condensing units on top of ceiling panels.
Split-Over Partition Wall Ceiling Installation
Indoor applications: Apply a continuous 3/8” bead of non-drying (butyl) sealant
to the both sides of the wall to ceiling joint. Lock ceiling panels together and
align over partition wall. Once all ceiling panels are assembled and aligned, lock
the wall to the ceiling.
Outdoor applications: Apply butyl tape to the partition wall anchor plate. Lock
ceiling panels together and align over partition wall. Once all ceilings are assembled
and aligned, attach lag bolts through the ceiling cam lock hole into the anchor plate.
3/8 LAG BOLTS THROUGH
MALE CAM LOCK HOLES
PARTITION WALL
ANCHOR
PLATE
CEILING
PANELS
BUTYL
REFRIGERATION
TAPE (SHIPPED
LOOSE)
Loading ...
Loading ...
Loading ...