www.kolpak.com 800-225-9916 6
Site Preparation
CAUTION
Ensure that the area for installation is level and clear of all debris before beginning
assembly. If care is not taken to assure a level base, wall and ceiling panels will not
align properly, causing problems in installation and operation of door panels, and
potential performance issues due to escessive air leaks. The two recommended
techniques to level the floor area are self-leveling epoxy and/or asphalt shingles.
For concrete slabs, above grade is recommended. A slab below grade is not permitted.
A 2” minimum clearance is required between the unit and any adjacent structures to
allow for wall surface irregularities and for air circulation. Air circulation around the
walk-in of 5 CFM per 100 Sq. Ft. of wall area is recommended. Failure to allow for this
clearance and air flow may result in performance issues such as excesive moisture
and/or condensation in the unit or adjoining areas.
Using the supplied assembly drawing (in hardware box), mark the perimeter of
screed, wall, or floor sections on the existing building floor using a chalk line.
Perimeter lines must be square and parallel. Use the 3, 4, 5 rule of squaring.
After the first two lines, measure and establish the rest of the perimeter.