Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/71014326-pto-kit-pulley-nj-tc-tcsd/bg1e.png)
Tool Bag «H»
▶ for NJ 92:
Pre-assemble the belt (16) protection bracket (15), and
x it in place using the self-tapping screws (17).
Fit the ensemble on the machine, xing it:
– to the lifting lever axle (18) using the support (19), the
threaded cap (20) and the screws (21) and nuts (22);
– to the side screwing the two screws (23) into the holes
marked with a «J».
▶ for NJ 92:
Slide the support axially (19) along the lifting lever axis
(18) until there is a distance of about 25-30 mm between
the pulley (23a) and the left side of the guard (16), then
block it in place using the two counter-posed caps (20a)
fastened by the screws (21a) and the nuts (22a).
Reassemble the left guard.
▶ for TC - SD 108 only:
Unload two sides of the rubber guard (25) as
indicated. ▶ A
▶ for SD 118 only:
Unload two sides of the rubber guard (25) as
indicated. ▶ A.1
▶ for TC - TX - SD:
Pre-assemble the belt protection (25) bracket (24), and
x it in place using the self-tapping screws (26).
Fit the ensemble on the machine, xing it:
– to the engine support plate using the screws (27) and
nuts (28);
– to the side screwing the two screws (29) into the holes
marked with a «T».
Fasten the right side of the guard (16 or 25) using the self-
tapping screw (26a).
30
A
A
A.1
A.1
TC - TX - SD
NJ
NJ
Loading ...
Loading ...
Loading ...