Loading ...
Loading ...
Loading ...
14
SET-UP
SETUP
Chute Control Cable Routing (If Equipped)
For models equipped with 2-way or 4-way chute controls,
electric chute control and/or chute-pitch controls, ensure control
cables are routed properly.
Chute control cables are routed through a single wire guide (a) on
top of the engine and/or through two wire guides (b) located on
the front and left side of the engine (Figure 41).
NOTE: On models equipped with a cable tie securing the cables to
the rear of the gas tank, pull the cables toward the chute and pull
the cable tie snug to secure the cables in place.
NOTE: For smoothest operation, cables should all be to the left of
the chute control rod (c).
NOTE: The number of cables routed through the wire guides will
vary depending on model.
1. Locate cable guide(s) and perform the following:
Top Mounted Wire Guide (a) - Check that all cables are
properly routed through cable guide on top of engine
(Figure 41).
Front and Side Mounted Wire Guides (b) - Check that all
cables are properly routed through the wire guide below the
left side of the engine and the wire guide below the chute
control head (Figure 41).
a
c
c
b
Figure 41
Shear Pins Storage (If Equipped)
On select models, holes are provided in the rear of the handle
panel for shear pin (a) and bow-tie cotter pin (b) storage as
shown in Figure 42. If not provided, make sure to store them in a
safe place until needed.
a
a
a
b
b
b
b
a
Figure 42
Drift Cutters (If Equipped)
The drift cutters are mounted inverted at the factory for shipping
purposes.
Non-Adjustable
1. Remove carriage bolts (a) and lock nuts (b) shipped with each
drift cutter (Figure 43).
a
b
Figure 43
2. Using the carriage bolts and lock nut removed in Step 1,
secure the drift cutters to the auger housing as shown in
Figure 43.
Tool-less
1. Remove carriage bolts (a) and wing nuts (b) shipped with the
drift cutters (Figure 44).
Loading ...
Loading ...
Loading ...