Loading ...
Loading ...
Loading ...
13
BEFORE YOUR FIRST WASH
Before you start, mark (
 
) accordingly if you have gone through
the checklist below:
1
Have the packaging and transit bolts been removed?
2
Is the drain hose threaded through the hose guide ‘Ubend’ (with no more
than 20mm extended) and hooked into your standpipe or tub, or attached
toa spigot?
3
Is the hot water hose connected to the hot valve (colour-coded orange)?
4
Is the cold water hose connected to the cold valve (colour-coded grey)?
5
Have the taps been turnedon?
6
Is the washer correctly levelled, feet are locked and cabinet corners clear
ofthe floor and walls?
7
Has the power cord been connected to an appropriate power supply
andthepower turned on?
8
Have you performed the installation test cycle? (see previous page)
IMPORTANT!
You must ensure all 4 transit bolts have been removed from your washer before
you start using it. If the transit bolts are not removed, they will damage your washer
and YOUR MANUFACTURER’S WARRANTY WILL BE COMPROMISED.
Loading ...
Loading ...
Loading ...