Hoover H7W 69MBCR-80 Washing machine

Instructions Manual - Page 7

For H7W 69MBCR-80.

PDF File Manual, 40 pages, Read Online | Download pdf file

H7W 69MBCR-80 photo
Loading ...
Loading ...
Loading ...
EN
2-Installation
7
2.1 Preparation
Make sure there is no transport damage.
Make sure all transport bolts are removed.
Handle the appliance always with at least two persons because it is heavy.
Take the appliance out of the packaging.
Remove all packaging material including protecting fi lm on cabinet, polystyrene
base, keep them out of children reach. While opening the package, water drops may
be seen on plastic bag and porthole. This normal phenomenon results from water
tests in the factory.
1. When opening the shrink package, you will nd
some noise reduction pads.These are used for re-
ducing noise. (Fig. 2-1)
2. Lay the washing machine down to its side, porthole
pointing upwards, bottom side towards operator.
3. Take out the noise reduction pads and remove
the double-sided adhesive protective film; paste
around the bottom; the noise reduction pads
under the washing machine cabinet as shown in
Figure 3. (two longer pads in position 1 and 3, two
shorter pads in position 2 and 4). Finally set the
machine upright again.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environ-
mentally friendly manner.
2.3 Dismantle the transportation bolts
The transport protection on the rear side is designed
for clamping anti-vibration components inside the ap-
pliance during transportation to prevent inner dam-
age. All elements (T1, T2,T3 and T4, F ig 2 -2) must be
removed before use.
1. Remove all 4 bolts (T1 - T4) (Fig. 2-3).
2. Fill the 5 holes with blanking plugs.
Please note: for 8kg models, please fi ll the
4 h oles w ith blanking plugs.
2x
3.
2x
2-2
2-3
2-2
2-1
2-2
1.
2.
2.
10-1
2.2 OPTIONAL: Install noise reduction pads
Packing boll(1234) Hole wall(12345)
Remove the four Plug the five hole walls
packing bolls
2-3
Loading ...
Loading ...
Loading ...