Crown Verity CVMCC72RDP CV-MCC-72RDP 72" Mobile Club Series Liquid Propane Grill , 159000 BTU, Remote Propane Cart

User Manual - Page 27

For CVMCC72RDP. Also, The document are for others Crown Verity models: MCB30*, MCB36*, MCB48*, MCB60*, MCB72*, MCB42*, RCB30*, RCB36*, RCB48*, RCB60*, RCB72*, RCB42*, PCB36*, PCB60*, CCB48*, CCB60*, CCB72*, MCC60*, MCC72*, MG30*, MG36*, MG428*, MG48*, MG60*, MG72*

PDF File Manual, 64 pages, Read Online | Download pdf file

CVMCC72RDP photo
Loading ...
Loading ...
Loading ...
Page 27 of 64
WARNING:
The Operating Pressure of the appliance is 10.0" W.C. for a Commercial Grill
(9.0
inches W.C. for Residential Grills).
A step-down regulator MUST be used on an LP house
system to reduce the pressure down to the specified W.C. for the grill.
IMPORTANT:
Always close the gas supply shutoff valve before disconnecting the appliance’s
gas supply hose.
IMPORTANT:
An installer-supplied safety shutoff valve MUST be installed on the liquid
propane gas supply line for the appliance. The valve should be easily accessed and located
between 3 and 20 feet (1 to 6 m) away from the oven. All gas connections should be made by a
licensed technician. The installation and all installer-supplied parts must conform to local codes.
In the absence of local codes, the installation and all parts should conform to the National Fuel
Gas Code, ANSI Z223.1/ NFPA 54 or Natural Gas and Propane Installation Code, CSA B149.1.
IMPORTANT:
Diameter and length of the gas supply pipe may limit the pressure and BTU
delivery of gas to the unit. The installer must ensure proper delivery to the appliance or it will
not operate properly
(See Appendix “B” for further details).
The appliance and its individual
shutoff valve must be disconnected from the gas supply piping system during any pressure
testing of that system at pressures in excess of 1/2 psi (3.5 kPa). During any pressure testing of
the gas supply piping system at test pressures equal to or less than 1/2 psi (3.5 kPa), the
appliance must be isolated from the system by closing its individual manual shutoff valve.
All pipe sealants must be of an approved type
.
SB-MCB Side Burner Option (Commercial Grills Only)
The SB-MCB side burner option is available on Commercial Grills only and can come factory
installed at the time of purchase or can be added to an existing grill at a later date. The side
burner has a single 15,000 BTU burner and is available in both LP and NG gas configurations.
INSTALLATION OF A SB-MCB SIDE BURNER
If the side burner was purchased for an existing grill, the following instructions apply.
All
gas connections should be made by a licensed technician.
1. Remove the push handle from the right side of the grill by removing the two bolts from
the inside of the grill. You must remove the face plate to access the front bolt
(See
“Figure 19” for further details on the face removal and “Figure 8 for the handle
removal).
Loading ...
Loading ...
Loading ...