Loading ...
Loading ...
Loading ...
20306741
19
BLDV7 Series Gas Fireplace
VENTING INSTALLATION
2. Remove soil to a depth of approximately 16” (406 mm)
below base of snorkel. Install drain pipe. Install window
well (not supplied). Rell hole with 12” (305 mm) of
coarse gravel leaving a clearance of approximately 4”
(102 mm) below snorkel. Figure 21
3. Install vent system.
4. Ensure a watertight seal is made around the vent pipe
coming through the wall.
5. Apply high temperature sealant caulking (supplied)
around the 4” and 7” snorkel collars.
6. Slide the snorkel into the vent pipes and secure to the
wall.
7. Level the soil so as to maintain a 4” (102 mm) clear
ance
below snorkel. Figure 21
BG402a
Top Vent
Below grade installation
1/26/00 djt
Firestop
7” Pipe
7TDVSNORK
(Snorkel)
4” (102 mm)
Clearance Min.
Window
Well
Gravel
Drain
BG402a
Figure 21 -
Below Grade Installation
*A minimum of 24” (610 mm) ver-
tical pipe must be installed when
using the 7TDVSNORK Kit.
24” (610 mm)
Minimum*
Screws
Foundation Wall
Do not back ll around snorkel.
A clearance of at least 4” must be main-
tained between the snorkel and the soil.
If the foundation is re-
cessed, use recess
brackets (not supplied)
for securing lower portion
of the snorkel. Fasten
brackets to wall
rst,thensecure
to snorkel with
self drilling #8 x
1/2 sheet metal
screws. It will be
necessary to ex-
tend vent pipes
out as far as the
protruding wall
face. Figure 22
VERTICAL THROUGH-THE-ROOF
APPLICATION
Thisgasreplacehasbeenapprovedfor:
Vertical installations up to 40’ (12 m) in height. Up to
a10’(3m)horizontalventruncanbeinstalledwithin
the vent system using a maximum of two 90° elbows.
Figure 23
Uptotwo45°elbowsmaybeusedwithinthehorizontal
run.Foreach45°elbowusedonthehorizontalplane,
the maximum horizontal length must be reduced by
18” (450 mm).
Example:Maximumhorizontallength:
No elbows = 10’ (3 m)
1 x 45° elbow = 8.5’ (2.6 m)
2 x 45° elbows = 7’ (2.1 m)
A minimum of an 8’ (2.5 m) vertical rise is required.
Two sets of 45° elbow offsets may be used within the
vertical sections. From 0 to a maximum of 8’ (2.5 m) of
vent pipe can be used between elbows. Figure 23
7DVCS supports offsets. Figure 27. This application
willrequirethatyourstdeterminetheroofpitchand
use the appropriate starter kit. (Refer to Venting Com-
ponents List)
The maximum angular variation allowed in the system
is 270°. Figure 24
For the minimum height of the vent above the highest
point of penetration through the roof refer to Page 21,
Figure 28.
Max. Height 40’ (12 m)
Min. Height 8’ (2 m)
Max. 10’ (3 m)
12” (305 mm)
Min.
Support Straps
Every 3' (914 mm)
FP1183
Figure 23 -
Support Straps for Horizontal Runs
BG401
Snorkel
2/10/99 djt
Snorkel
Wall
Screws
Foundation
Recess
Watertight
Seal Around
PIpe
Sheet Metal
Screws
BG401
Figure 22 -
Snorkel Installation,
Recessed Foundation
Loading ...
Loading ...
Loading ...