Venting & air — general (cont.)
&IGURE ECO venting and air piping — DIRECT VENT ONLY — OPTIONS and PIPING LIMITS
The table below lists the acceptable vent/air pipe terminations described in this manual. Follow all instructions provided to install the
vent/air system. ./43(/7. below, but also approved, are the polypropylene piping and terminations listed in Figure 20, page 20.
For these applications, use ONLY the manufacturers’ parts listed and follow all instructions provided by the pipe manufacturer.
ECO Model
Maximum vent and air pipe length = 100 feet for all applications
(Minimum length for all applications is 2 feet)
(All applications include allowance for the termination fittings plus one elbow in air piping and one elbow in vent piping)
USE SWEEP
ELBOWS
ONLY
See Figure20,page20 for material specications | See Figure109,page107 for part/kit numbers
Vent and air pipe sizes:
Maximum vent lengths apply for either 2” or 3” vent and air pipe.
If using 2” pipe, provide 3”x 2” reducers at boiler connections and at Weil-McLain vent/air cap or at concentric terminations.
Boilers will derate as vent/air pipe length increases — see rating data on Figure122,page119 for derate amounts.
SIDEWALL termination VERTICAL termination
Separate pipes
[Note 1]
PVC or PP Concentric
[Note 1]
3” Weil-McLain PVC
vent/air cap [Note 1]
Separate pipes
[Note 1]
PVC or PP Concentric
[Note 1]
See page 24 See page 26 See page 28 See page 30 See page 32
Size,
inches
Materials
Fig. 20, page 20
Size,
inches
Materials
Fig. 20, page 20
Size,
inches
Materials
Fig. 20, page 20
Size,
inches
Materials
Fig. 20, page 20
Size,
inches
Materials
Fig. 20, page 20
70
2
PVC/PVC-DWV
CPVC, PP, SS
2
PVC/PVC-DWV
CPVC, PP, SS
2
PVC/PVC-DWV
CPVC, PP, SS
2
PVC/PVC-DWV
CPVC, PP, SS
2
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
110
2
CPVC, PP or SS
ONLY
2
CPVC, PP or SS
ONLY
2
CPVC, PP or SS
ONLY
2
CPVC, PP or SS
ONLY
2
CPVC, PP or SS
ONLY
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
155
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, SS, PP**
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, PP, SS
3
PVC/PVC-DWV
CPVC, SS,
** Model 155 may be concentric sidewall vented using Centrotherm polypropylene pipe (Eco Systems InnoFlue® Single-wall) ONLY
if using Centrotherm stainless steel concentric termination kit, part number ICWS3513.
!LLELBOWSINVENTANDAIRPIPINGMUSTBESWEEPELBOWS/.,9$/./4USESHORTRADIUSELBOWS
Equivalent feet for elbows (USE SWEEP ELBOWS ONLY)
deduct from max equivalent length of piping (does not apply to termination fittings)
tGFFUQFSGPSFBDIBEEJUJPOBM¡TXFFQFMCPXPS¡FMCPX
If piping contains more than 1 elbow in air or vent piping, other than termination fittings
Note 1:
.BUFSJBMBCCSFWJBUJPOT11QPMZQSPQZMFOF44"-$TUBJOMFTTTUFFM
If using polypropylene or stainless pipe, provide adapters to for 3” boiler connections and for terminations, if required
*1&9w17$DPODFOUSJDWFOULJUTDBOCFVTFEXJUITUBOEBSE17$QJQFmUUJOHTBOEDFNFOU"/4*"45.%FYDFQUJG6-$4DPNQMJBODF
JTSFRVJSFE'PS6-$4DPNQMJBODFBMMQJQFmUUJOHTBOEDFNFOUNVTUCF*1&94ZTUFN*GVTJOH*1&9LJUTVTFPOMZ*1&9QSPEVDUDPEF
GPSwWFOUJOH
Contact Weil-McLain for ordering information and availability of Weil-McLain venting kits.
Part number 550-142-122/0513
19
TM
GAS-FIRED WATER BOILERBoiler Manual