Panamax SM3-PRO Compact BlueBOLT System Manager SM3PRO

User Manual - Page 7

For SM3-PRO.

PDF File Manual, 16 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
5
POWER CYCLE AND OUTLET SEQUENCING
The outlet banks of the SM3-PRO are configured to turn on and off in a pro-
grammed sequence where each outlet bank has a set of programmed delay
times.
Outlet Bank Power Cycle Delay Turn On Delay Turn Off Delay
1 5 seconds 0 seconds 10 seconds
2 10 seconds 0 seconds 10 seconds
Power Cycle Delay: When a Power Cycle is initiated, the outlet bank will immediately turn off and then turn back on after the Power Cycle Delay time
Turn On Delay: When a Turn On Sequence is initiated, the outlet bank will turn ON after the Turn On Delay time.
Turn Off Delay: When a Turn Off Sequence is initiated, the outlet bank will turn OFF after the Turn Off Delay time.
The delay times are pre-programmed but may be changed on the BlueBOLT web
site or by issuing the <set> command to the Ethernet port (see the Advanced
Operation section for details). The default configuration is:
SM3-PRO Specifications
Specifications subject to change due to product upgrades and improvements.
AC POWER
Operating Voltage 120 Vac / 60Hz
Current Capacity 15 A
UL 1449 Voltage Protection Rating 330V L-N, 400V L-G, 400V N-G
UL 1449 Nominal Discharge Current 3,000A
Initial Clamping Level 200V
Energy Dissipation 1,575 Joules (8/20µs)
Overvoltage shutoff 134 Vac ± 2 Vac
Undervoltage shutoff 95 Vac ± 2 Vac
EMI / RFI Noise Filtration -18.7dB @ 10kHz
-50.5dB @ 100kHz
-43.9dB @ 1MHz
Loading ...
Loading ...
Loading ...