Phezer PL5 PLUS Handheld Laser Engraver Machine, 20w/ 30w Output Power High Precision Fiber Laser Engraving Marking Machine for Precision Metal Electronics Jewelry Cosmetic Food and Beverage Packaging

User Guide - Page 7

For PL5 PLUS.

PDF File Manual, 40 pages, Read Online | Download pdf file

PL5 PLUS photo
Loading ...
Loading ...
Loading ...
PL5 Series Fiber Laser Marking System Page 7 of 40
2.3.3 Other Hazards
The following hazards are typical for this product family when incorporated for intended use:
Risk of injury when lifting or moving the unit
Risk of exposure to hazardous laser energy through unauthorized removal of access panels,
doors, or protective barriers
Risk of exposure to hazardous laser energy and injury due to failure of personnel to use proper
eye protection and/or failure to adhere to applicable laser safety procedures
Risk of exposure to hazardous or lethal voltages through unauthorized removal of covers, doors,
or access panels
Generation of hazardous air contaminants that may be noxious, toxic, or even fatal during laser
processing.
2.4 Compliance
Phezer PL5 Series Handheld Fiber Laser Marking Systems are designed, tested, and certified to comply
with certain China (CN), United States (U.S.) and European Union (EU) regulations. These regulations
impose product performance requirements related to electromagnetic compatibility (EMC) and product
safety characteristics for industrial equipment.
2.4.1 RoHS Compliance
Phezer PL5 Series Handheld Fiber Laser Marking Systems meet the requirements of the European RoHS
Directive 2011/65/EU on the Restriction of the Use of Certain Hazardous Substances in Electrical and
Electronic Equipment that establishes maximum concentration values for certain hazardous substances
in electrical and electronic equipment.
2.4.2 FCC Requirements
Phezer PL5 Series Handheld Fiber Laser Marking Systems are designed to meets the FCC Rules. The
purpose of the design is to prevent harmful electromagnetic interference.
The FCC warns the user that changes or modifications of the unit not expressly approved by the party
responsible for compliance could void the users authority to operate the equipment.
Loading ...
Loading ...
Loading ...