14 31-5000573 Rev. 2
ENGLISH
INSTALLATION INSTRUCTIONS
Inspecting and Handling the Unit
Inspection
The unit must be checked when delivered for any damage. Report any damage immediately to the freight carrier.
Transportation
Please do not dismantle the unit packaging for transportation. Remove the packaging only when resting near the final
installation location.
Do not suspend the unit from less than 4 points and cushion the cables at the top edge of the equipment. Do not sit on
the unit during lifting. Always keep the unit upright. Use the openings in the unit base for the forklift handling.
Steel Cable
Cushion
Forklift Opening
Distance 18-29/32.
Hoisting Opening Diameter 1-9/16 mm,
Distance 41in.
MVHR096/120/144ME2CA
MVHR096/120/144ME4CA
Forklift Opening
Distance 18 -29/32 in.
Hoisting Opening Diameter
1-9/16 mm, Distance 28-3/4 in.
MVHR072ME2CA
MVHR072ME4CA