Tripp Lite MBP6K208 Eaton 9PX Maintenance Bypass for Select 5kVA to 6kVA 9PX UPS Systems, Hardwired Input/Output, 2 L6-30R Outlets, 3U Rack/Tower

Installation and user manual - Page 37

For MBP6K208. Also, The document are for others Tripp Lite models: 9PX 700 RT, 9PX 1000 RT, 9PX 1000GRT, 9PX 1500 RT, 9PX 1500GRT, 9PX 2000 RT, 9PX 2200 GRT, 9PX 3000 RT, 9PX 3000 GRT, 9PX 3000 GLRT, 9PX EBM 36V RT, 9PX EBM 48V RT, 9PX EBM 72V RT

PDF File Manual, 46 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Page 37
9PX 1-3 KVA US_EN
ENGLISH
6. UPS maintenance
To replace the battery pack:
1. Remove the center cover of the front panel.
2. Push left cover toward to right direction.
3. Open the battery door.
4. Disconnect the battery connectors.
A ribbon cable connects the LCD control panel to the UPS. Do not pull on the cable or disconnect it.
5. Remove the two screws to pull out the metal protection cover of the battery.
6. Pullouttheplastichandleofthebatterypack,andslidethepackoutslowlyontoaatandstablesur-
face. Use two hands to support the battery pack. See "Recycling the used equipment"
on page 38 for proper disposal.
7. Verify that the replacement batteries have the same rating as the batteries being replaced.
8. PutthenewbatterypackintotheUPS.Pushthebatterypackrmlytoensureaproperconnection.
9. Screw back the metal protection cover and the front panel, then clip the center cover.
10. Continue to “Testing new batteries” on page 37.
Replacing the EBM(s)
The EBM is heavy. Lifting the cabinet into a rack requires a minimum of two people.
To replace the EBM(s):
1. Unplug the EBM power cable and battery detection cable from the UPS.
If additional EBM(s) are installed, unplug the EBM power cable and battery detection cable
from each EBM.
2. Replace the EBM(s). See "Recycling the used equipment" on page 38 for proper disposal.
A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and will
notharmpersonnel.InserttheEBMcableintotheUPSbatteryconnectorquicklyandrmly.
3. Plug the EBM cable(s) into the battery connector(s). Up to four EBMs may be connected to the UPS.
4. Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for each
cable.
5. Connect the battery detection cable(s) to the connector of the UPS and of the EBM(s).
Testing new batteries
To test new batteries:
1. Charge the batteries for 48 hours.
2. Press any button to activate the menu options.
3. Select Control then Start battery test.
The UPS starts a battery test if the batteries are fully charged, the UPS is in Normal mode with no active
alarms, and the bypass voltage is acceptable.
During the battery test, the UPS transfers to Battery mode and discharges the batteries for 25 seconds.
The front panel displays "Battery test in progress" and the percentage of the test completed.
Loading ...
Loading ...
Loading ...