Blue Seal Evolution G57-B Series 900mm Gas Target Top Bench Model

Installation Operation Manual - Page 15

For G57-B.

PDF File Manual, 29 pages, Read Online | Download pdf file

G57-B photo
Loading ...
Loading ...
Loading ...
Installation
13
7. Check gas operating pressure is as shown in
'Specifications' section.
NOTE: Measure Burner operating pressure at target
top hob manifold test point with target top
burner (Inner and outer ring) operating at full
setting.
8. Verify operating pressure remains correct.
NOTE: This appliance is fitted with adjustable feet to
enable appliance to be positioned securely
and level. This should be carried out on com-
pletion of gas connection.
Commissioning
Before leaving new installation;
1. Check following functions in accordance with operating instructions specified in 'Operation' section of
this manual.
 Light the Pilot Burner.
 Light the Main Burner.
 Check the Low Fire burner operation.
 Check the High Fire burner operation.
2. Ensure the operator has been instructed in areas of correct lighting, operation and shutdown
procedure for appliance.
This manual must be kept by owner for future reference, and a record of
Date of Purchase,
Date of
Installation
and
Serial Number of Appliance
recorded and kept with this manual. (These details
can be found on Rating Plate. Refer to ‘Dimensions’ section for Rating Plate location for all
models).
NOTE: If for some reason it is not possible to get appliance to operate correctly, shut ‘Off’ gas
supply and contact supplier of this appliance.
Gas Pressure
Test Point
Fig 2
For Refrigeration Cabinet Installation details, refer to Refrigeration Cabinet Installation and
Operation Manual supplied with appliance.
Loading ...
Loading ...
Loading ...