25
70458301ENR6
Installation
Pre-Installation Inspection
Upon delivery, visually inspect the crate, carton and
parts for any visible shipping damage. If the crate,
carton, or cover is damaged or signs of possible
damage are evident, have the carrier note the condition
on the shipping papers before the shipping receipt is
signed, or advise the carrier of the condition as soon as
it is discovered.
Remove the crate and protective cover as soon as
possible and check the items listed on the packing list.
Advise the carrier of any damaged or missing articles
as soon as possible. A written claim should be filed
with the carrier immediately if articles are damaged or
missing.
IMPORTANT: Remove the shipping tape from the
two back draft dampers located in the exhaust
outlet.
IMPORTANT: Warranty is void unless tumble
dryer is installed according to instructions in this
manual. Installation should comply with minimum
specifications and requirements detailed in this
manual and applicable local gas fitting regulations,
municipal building codes, water supply regulations,
electrical wiring regulations, and any other
relevant statutory regulations. Due to varied
requirements, applicable local codes should be
thoroughly understood and all pre-installation
work arranged for accordingly.
NOTE: 3 Phase Only – Each tumble dryer must be
connected to its own individual branch circuit
breaker, not fuses, to avoid the possibility of “single
phasing” and causing premature failure of the
motor(s).
Location Requirements
The tumble dryer must be installed on a level floor.
Floor covering materials such as carpeting or tile
should be removed.
To assure compliance, consult local building code
requirements. The tumble dryer must not be installed
or stored in area where it will be exposed to water and/
or weather.
IMPORTANT: DO NOT block the airflow at the
rear of the tumble dryer with laundry or other
articles. Doing so would prevent adequate air
supply to the combustion chamber of the tumble
dryer.
A typical tumble dryer enclosure is shown in Figure 2.
IMPORTANT: Install tumble dryers with sufficient
clearance for servicing and operation, refer to
Figure 2.
Materials Required (Obtain Locally)
All Models
One Single Pole fused disconnect
switch or circuit breaker on 1 Phase
models.
Circuit breaker on 3 Phase models.
Gas Models
One gas shut-off valve for gas service
line to each tumble dryer.
Steam Models
One steam shut-off valve for steam
service line to be connected upstream of
solenoid steam valve.
Two steam shut-off valves for each
condensate return line.
Flexible steam hoses with a
125 psig (pounds per square inch gauge)
(8.79 kg/sq. cm) working pressure for
connecting steam coils. Refer to
Figure 27 for sizing and connection
configurations.
Two steam traps for steam coil outlets to
condensate return line.
Optional – Two vacuum breakers for
condensate return lines.
Loading ...