GE - General Electric IM3 GE Icemaker Kit

User Manual - Page 19

For IM3.

PDF File Manual, 54 pages, Read Online | Download pdf file

IM3 photo
Loading ...
Loading ...
Loading ...
19
Installing the Water Valve Assembly
Step 5
Fasten the plastic water line to
the back of the cabinet with
adhesive-backed fasteners (5),
spacing
the fasteners
as shown
to take up slack in the line.
Adhesive-backed
fasteners for
plastic water line
Step 6
Refer to the Water Line
Installation Instructions for
connection to home water
supply. After the water line
installation is completed, lower
the icemaker feeler arm to the
ON (down) position.
The ice-making cycle will
not begin until the icemaker
and freezer compartment
reach operating temperature,
then ice-making will begin
automatically.
Step 4
Cut 12 inches (30 cm) from the
end of the plastic water line.
• It may be necessary to remove
the screw from the top right
condenser mounting clip
for better access to the fill
tube inlet.
• Remove
the small
plastic cap
(C) from
the bottom
of the fill
tube inlet
located in the upper-right rear
corner of the refrigerator.
• Squeeze the ends of the hose
clamp (3) or (6) from the kit
with pliers and slide the clamp
over the fill tube inlet. (Use
the black clamp with the black
fill tube inlet, use the other
clamp with the other fill tube
inlet.) While still squeezing
the clamp, insert the plastic
water line into the inlet as far
as it will go (approximately 1
[25 mm]). Then slide the
clamp downward to capture
the plastic water line in place.
• Make sure the fill tube inlet is
aimed down.
• If the mounting screw was
removed, secure the condenser
to the refrigerator by replacing
the mounting clip and screw.
Do not over-tighten the screw.
Fill
tube
inlet
(Appearance
may vary)
6
3
C
or
Loading ...
Loading ...
Loading ...