Loading ...
Loading ...
Loading ...
Part No. 80106286
Revision C
25
Installation
Electrical Field Connections
PIN
NUMBER
DESCRIPTION WIRE TYPE CONNECT TO NOTES
1 +12V #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Transfer Switch
Basic Controller J7-8
12VDC
Transfer Switch Transfer Signal
(only works with Basic Transfer
Switch Controller)
2 GND #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Transfer Switch Basic
Controller J7-7 GND
3 Xfer #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Transfer Switch Basic
Controller J7-4 T/R
4 2-WIRE START #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Refer to Transfer
Switch Manual to
verify if this function
is available.
Contact Close for
GENSET Start.(Only for
Transfer Switch that provides
this option).
Mains monitoring must be
disabled in the controller.
5 2-WIRE START #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
6 E-STOP #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
E-Stop Switch Contact Open to Shutdown
GENSET
7 E-STOP #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
E-Stop Switch
9 VIN+
(+12V)
#18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Refer to the Amplify
Gateway Manual.
Comm to WIFI Module
Twisted Pair #1: +12V and GND
Twisted Pair #2: (D+) and (D-)
10 (D+) #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
11 (D-) #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
12 GND #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
13 +12V #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
Refer to the InfoHub™
Premium Manual.
Comm to Cellular Module
Twisted Pair #1: +12V and GND
Twisted Pair #2: (A) and (B)
14 (A) #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
15 (B) #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
16 GND #18 AWG (1 mm2) conductors,
600V minimum, 90° C Cu wire.
25 Utility #14 AWG [2.50 mm2] 600V
minimum, 90° C Cu Wire.
Transfer Switch
Utility
Voltage Sensing for GENSET
Start. Use either this signal
or two-wire Start Signal for
GENSET Start Signal (still
required in two-wire start
configuration for battery
charger).
26 Utility #14 AWG [2.50 mm2] 600V
minimum, 90° C Cu Wire.
Transfer Switch
Utility
• For power output connection (L1, L2, Neutral (N), and
Ground), refer to the National Electric Code (NEC)
and local codes.
• For communication wires use 300V wire and #18 AWG
(1 mm2) twisted-pair conductors that do not exceed a
length of 500 ft (150 m).
• When connecting to the terminal block, fasten only
one wire to each connector screw.
• Torque terminal block screws to 4.4 in-lb (0.5 N·m).
• Torque circuit breaker connections to 45 in-lb (5 N·m).
Not for
Reproduction
Loading ...
Loading ...
Loading ...