Loading ...
Loading ...
Loading ...
9
XBR25 STEP ONE
HARDWARE FOR STEP 1
PART TYPE DESCRIPTION QTY
65 BOLT
3/8”X53mm
2
67 BOLT
3/8”X4”
2
77 FLAT WASHER
Ø3/8” × Ø19 × 1.5T
4
84 FLAT WASHER
Ø3/8” × Ø25 × 2T
2
89 NYLOC NUT
3/8” x 7T
4
142 BOLT
3/8” x 4-1/4”
2
191 CAP NUT
3/8” X UNC16 X 12.5T
2
1. Gather HARDWARE FOR STEP 1.
2. Install the REAR STABILIZER (7) onto the
MAIN FRAME with 2 BOLTS (65) and 4
WASHERS (84).
3. Install the SEAT BACK (5) onto the SEAT
CARRIAGE (4) with 2 BOLTS (67) installed
through the top holes and secured with 2
FLAT WASHERS (77) and NYLOC NUTS
(89). Install 2 BOLTS (142) through the side
holes and secure with 2 FLAT WASHERS
(77) and NYLON NUTS (89).
4. Insert an END CAP (32) into each opening
of the FRONT STABILIZER TUBE. You may
need to tap them in with a rubber mallet if
they are tight..
Loading ...
Loading ...
Loading ...