Majestic WDV600PTSC Wall Mountable Direct Vent Liquid Propane Fireplace

User Manual - Page 19

For WDV600PTSC.

PDF File Manual, 52 pages, Read Online | Download pdf file

WDV600PTSC photo
Loading ...
Loading ...
Loading ...
78D0011
19
WDV Series Gas Fireplace

3. Cut a hole in the roof using the locating hole as a center
point. (Cover any exposed open vent pipes before
cutting hole in roof). The 10Z\x"x10Z\x" (241 x 241 mm)
hole must be measured on the horizontal. Actual length
may be larger depending on the pitch of the roof. There
must be a 1" minimum clearance from the vent pipe to
combustible materials. (Insulation should be considered
a combustible material).
4. Connect a section of pipe and extend up through the
hole.
        

Figure 22



5. Place the ashing over the pipe section(s) extending
through the roof. Secure the base of the ashing to
the roof and framing with roong nails. Be sure roong
material overlaps the top edge of the ashing. There
must be a 1" clearance from the vent pipe to combustible
materials.
6. Continue to add pipe sections until the height of the vent
cap meets the minimum building code requirements.

      
       





    
   
        

2 ft.
Min.
2 ft. Min.
X
12
H*
Horizontal Overhang
Termination
Vent
Lowest
Discharge
Opening
Storm
Collar
Flashing
Concentric
Vent Pipe
1" Minimum
Clearances to
Combustibles
Vertical Wall
FP1971
Figure 25 -
Minimum Chimney Clearance
 
Flat to 6/12 1.0
Over 6/12 to 7/12 1.25
Over 7/12 to 8/12 1.5
Over 8/12 to 9/12 2.0
Over 9/12 to 10/12 2.5
Over 10/12 to 11/12 3.25
Over 11/12 to 12/12 4.0
*H - Minimum height from roof to
lowest discharge opening of vent


Loading ...
Loading ...
Loading ...