Binder MKF 240 Dynamic climate chamber with humidity control, -liter capacity

User Manual - Page 127

For MKF 240.

PDF File Manual, 177 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
MKF / MKFT (E5) 06/2020 page 127/176
21.9 External freshwater and wastewater cans (option for MKF 56)
If no suitable in-house water connection is available, you can manually supply water by filling the optional
external freshwater can. There is an additional external water can for the waste water. The volume of
each can is 20 liters / 0.71 cu.ft.
You can place the cans next to the chamber.
21.9.1 Connecting the freshwater can and the pump
The water pump is attached to the MKF 56 housing with magnets.
Cable connection (21)
Freshwater hose connection (22)
Freshwater supply hose
Figure 24: Water pump on the chamber rear panel
Freshwater supply hose to the pump
Inlet opening (26) for the freshwater supply hose
Hose connection (24) of the freshwater can
with wastewater recycling (chap. 21.9.3)
Figure 25: Freshwater can
Hose between the pump and the freshwater can
The freshwater supply hose is located at the bottom of the pump. Lead it through the inlet opening (26)
into the freshwater can. The end of the hose must be placed at the bottom of the can.
Loading ...
Loading ...
Loading ...