Leak check
Performing leak test & insulation
Once you have checked that there are no leaks in the system, you can insulate the piping and hose.
1
To avoid condensation problems, place T13.0 or thicker Acrylonitrile Butadien Rubber separately around each refrigerant
pipe.
2 Wind insulating tape around the pipes and drain hose avoiding to compress
the insulation too much.
3
Finish wrapping insulating tape around the rest of the pipes leading to the outdoor
unit.
4 The pipes and electrical cables connecting the indoor unit with the outdoor
unit must be xed to the wall with suitable ducts.
5 Select the insulation of the refrigerant pipe.
Insulate the gas side and liquid side pipe referring to the thickness
according to the pipe size.
Indoor temperature of 30°C and humidity of 85% is the stan dard condition.
If installing in a high humidity condition, use one grade thicker insulator by referring to the table below.
If installing in an unfavorable conditions, use thicker one.
Insulator’s heat-resistance temperature should be more than 120°C.
Leak test
Insulation
No gap
NBR(T13.0 or thicker)
Insulation cover pipe
Indoor unit
Be sure to overlap
the insulation
Insulation pipe
• Mustttightlyagainst
body without any gap.
• Alwaysmaketheseamofpipesfaceupwards.
• Allrefrigerantconnectionmustbeaccessible,inordertopermit
either unit maintenance or removing it completely.
• TheinsulationhastobeproducedinfullcomplianceofEuropean
regulation reg. EEC / EU 2037/ 2000 that
requires the use of sheaths insulation form without using CFC and
HCFC gases for health and the environment.
LEAK TEST WITH NITROGEN (before opening valves)
In order to detect basic refrigerant leaks, before recreating the vacuum and
recirculating the R-410A, it’s responsable of installer to pressurize the whole
system with nitrogen (using a cylinder with pressure reducer)
at a pressure above 30 bar (gauge).
LEAK TEST WITH R-410A (after opening valves)
Before opening valves, discharge all the nitrogen into the system and create
vacuum. After opening valves check leaks using a leak detector for refrigerant
R-410A.
• Dischargeallthenitrogentocreateavacuumandchargethesystem.
G_4
NS

HHXEG
AC

JNHFKH
CAUTION
CAUTION
CAUTION
CAUTION
NOTE