INSTALLATION
CAVITY DIMENSIONS
BGB-48 BGB-36
MM MM
A
Maximum height of enclosure shell
902 902
B
Depth of enclosure shell
578 578
C
Minimum depth for hood swing
76 76
D
Width of enclosure cavity
1162 876
E
Height of enclosure cavity
257 257
f
Depth to gas supply opening
470 470
G
Minimum height to base of vents
25 25
D
E
G
F
A
B
C
Built-in Construction Details
Standard layout for non-combustible cavity
IMPORTANT!
If installing the grill into a non-combustible enclosure, all combustible construction must still be
outside the 310mm clearance zone. If your island is made of stucco over the top of wooden studs,
the wood cannot be inside the 310mm clearance zone to combustible, even though the stucco is
what is touching the grill area.
IMPORTANT!
Providing ventilation openings as per the diagrams is mandatory.
Providing an access opening from the front is mandatory. The opening must be large enough to
allow easy access to the cylinder valve or shut-off valve for the purposes of shutting gas off to the
appliance. If gas supply is via cylinder, the opening must be large enough to allow easy placement
and removal of the cylinder too. A custom door may be fitted over the opening, but the user should
be able to open the door at all times.
Note: vents are to be located
at the left, right and rear of the
enclosure. Minimum size of all
vents is 650mm x 650mm).
Note: 102 x 102mm opening
for gas supply line.
Opening for access to gas
cylinder or shut off valve.
Fig. 09