V-Tac VT48100E-P2 5.12kWh Rack Mounting LiFePO4 Battery 51.2V CEI-021

Manual - Page 15

For VT48100E-P2.

PDF File Manual, 25 pages, Read Online | Download pdf file

VT48100E-P2 photo
Loading ...
Loading ...
Loading ...
6 Installation
6.2 Open-pack Inspection
1 Move the battery to the nearby of site.
2 Use a claw hammer to open the box and check whether the items are complete.
3 Check the appearance whether there is damaged or leakage.
ATTENTION
The battery is heavy, if possible, please use tools to assist in handling.
NOTE
Package contains VT48100E ESS series batteries, operation manual
and accessories.
If the battery is found to be damaged or leakage, please do not
proceed to the next installation, and contact supplier or an authorized dealer in
time.
6.3 Installation
1 Make sure the Power system is in off state.
2 Put the battery into cabinet or rack.
3 Use 4 M6x25 bolts to fix the battery pack on the cabinet.
4 Take out the ground wires and connect one end to the ground point of the
battery pack and the other end to the ground point of the cabinet.
ATTENTION
The battery pack should be installed by professionally trained personnel, and it
is strictly forbidden to install it without permission.
Use insulated tools during installation to avoid electric shock. If you use tools
without insulation protection, you need to wrap the exposed metal parts with
insulation tape for insulation treatment.
The battery pack is heavy, and at least 4 manpower must be prepared during
the transportation and installation process. If possible, please use tools to assist in
handling.
Loading ...
Loading ...
Loading ...