When a cumulative run time of 20 hours has been
reached, replace the engine lubrication. After the rst time
of replacing lubricant, replace the lubricant every 100
hours.
When a cumulative time of 50 hours is reached, clean the
air lter.
When a cumulative time of 100 hours is reached, clean
the spark plug.
C.5Volt2AmpUSBreceptacle.
D. MultiVolts(5V,9V,15Vand20V)USB-TypeC
receptacle.
E.Maincircuitbreakerbutton–Main circuit breaker is
designed to protect the generator against overload. The
breaker will trip and the button will stick out if overload
happens. Press the main circuit beaker button to reset the
circuit.
F. 120VoltAC30AmpRVreceptacle.
G. 120VoltAC30Amptwistlockreceptacle.
H.ACcircuitbreakerbutton–AC circuit breaker is
designed to protect the AC circuit against overload. The
breaker will trip and the button will stick out if overload
happens. Press the AC circuit breaker button to reset the
circuit.
I. 120VoltAC20Ampduplex receptacle.
Start the Generator
Electric start
Follow the instruction below to start the generator.
1. On a level surface with the engine o, check the lubricant
level before each use of the generator.
NOTE: If location of generator is not level, the unit may
not start or may shut down during operation.
2. Make sure there's no load plugged into the generator.
3. Open the storage compartment, and insert the battery into
the battery compartment (Fig. 20).
4. Make sure the propane cylinder is tested and installed as
described, then open the cylinder valve completely
(Fig. 21).
5. Press the engine switch to ON position (Fig. 22).
6. Move the choke lever all the way LEFT to the START
position (Fig. 23).
7. Press the engine switch to START position (Fig. 24).
Fig.20
Storage
compartment
cover
Battery packBattery
compartment
Fig.21
Cylindervalve
Regulator
START
ON
OFF
START
ON
OFF
Fig.22
Engineswitch
Fig.23
Chokelever
START
position
START
ON
OFF
START
ON
OFF
Fig.24
Engineswitch