Loading ...
Loading ...
Loading ...
9
ELECTRICAL REQUIREMENTS
POWER SUPPLY CORD
Wiring Requirements
115 Volt, 60Hz, 15-amp fused grounding 3-prong outlet
The use of a time-delay fuse or time-delay circuit breaker is recommended.
Use a dedicated circuit only.
NOTE: Do not operate any other electrical appliances on this circuit or the circuit breaker/fuse may trip.
If this power supply cord is damaged, it cannot be repaired. It must be replaced with a cord from the product manufacturer.
If the power supply cord is damaged, please contact Customer Service.
To test the power supply cord before operation:
1. Plug the power cord into a grounding 3-prong outlet.
2. Press the Test button, and then press and release the Reset button to restore the power.
REQUIRED GROUNDING METHOD
INSTALLATION INSTRUCTIONS
STEP 1 - UNPACK THE AIR CONDITIONER
!
WARNING
This air conditioner must be grounded.
The air conditioner is equipped with a power supply
cord that has a 3-prong grounding plug.
The power supply cord must be plugged into a
matching 3-prong grounding outlet, and must be
grounded in accordance with all local codes and
regulations.
115V
15 Amp
!
WARNING
Loading ...
Loading ...
Loading ...