Rinnai 31 ES_FT_OIM
HEATER INSTALLATION
7. FINAL CHECKLIST
*If you have answered NO to any of the above, you must correct before appliance hand-over to the customer.
(To be completed by certified Gas Installer) Yes /*No
1. Is the appliance positioned in a suitable location (clearances, combustible clearances
mantels and surrounds etc)?
2. Have all packaging / protective materials been removed prior to operation?
3. The Appliance Test Point (Burner) Pressure is correct for it's particular installation / flue
configuration and adjusted if necessary.
4. Have you used only Rinnai Energysaver® flueing components?
5. That the air inlet hose and flue connections are sound?
6. That the Appliance is secured to the wall as per Installation manual?
7. Gas Supply pipe is purged of foreign matter before connection?
8. That gas connections are correct?
9. Have you turned on the power?
10. Is the appliance inlet pressure correct with all other resident gas appliances operating?
11. Have you shown the customer how to operate the heater and informed them of the
safety requirements?
12. Where applicable, have you connected the condensation drain hose in accordance with
the Installation manual?
13. Have you checked the flue clearances and installation as per the Installation manual
and as per AS/NZS 5601?
14. Have you filled out the "Installation Record" found at the front of this manual?
15. Is the end-user fully aware of the servicing schedule?
16. Have you completed the "Energysaver® Commissioning Check List" attached to the
front of the Appliance?
17. Have you left this Operation and Installation manual with the customer?