NOTE:
These conversions should only be carried out by qualified persons. All connections must
be checked for leaks before re-commissioning the appliance.
Adjustment of components that have adjustments / settings sealed (e.g. paint sealed) can
only be adjusted in accordance with the following instructions and shall be re-sealed
before re-commissioning this appliance.
For relevant gas specifications refer to Gas Specifications Tablesat rear of this section.
1. Remove the following:-
Control Panel.
Toasting Rack.
Main Burner.
2. Remove injectors and replace with correct size injectors
as shown in Gas Specifications Tablesat rear of this
section.
3. Refit the following:-
Main Burner.
Toasting Rack.
1. Disconnect the following:-
Pilot Supply and Thermocouple Tubes from Gas
Control Valve.
Pilot Assembly from Griddle Toaster.
2. Remove pilot injectors and replace with correct size pilot
injectors as shown in Gas Specifications Tablesat rear of
this section.
3. Re-connect the following:-
Pilot Supply and Thermocouple Tubes to Gas Control
Valve.
Pilot Assembly to Griddle Toaster.
1. Light main burners and check flame size on Lowposition.
Adjust low fire adjustment screw on burner gas control valves to
obtain desired flame size.
NOTE: Low Fire Adjustment Screwshould be sealed with coloured paint
on completion of low fire adjustment.
2. Refit control panel.
3. Refit gas control knobs to gas control valves.
Wing Nut
Main Burner Injector
Thermocouple
Connection
Pilot Securing
Screws
Pilot Gas Supply Tube
Low Fire Screw