LG Electronics LQN120HV4 LG Air Conditioner Cooling Area, Adjustable Air Direction

User Manual - Page 23

For LQN120HV4.

PDF File Manual, 243 pages, Read Online | Download pdf file

LQN120HV4 photo
Loading ...
Loading ...
Loading ...
Ø2-3/4 inches
Ø2-3/4
inches
5-1/4 inches
3-3/4 inches
Right rear piping
Left rear piping
Installation Plate
Place a level on raised tab
Unit Outline
8-17/32 inches
6-7/8 inches
Figure 11:Installation Plate for LAN090HSV5 and LAN120HSV5 Units. Figure 12:Installation Plate for LAN180HSV5 Units.
Ø2-3/4 inches
Ø2-3/4 inches
2-23/32 inches
2-7/32 inches
Right rear
piping
Left rear
piping
Installation Plate
Measuring Tape
Measuring Tape Hanger
Place a level on raised tab
Unit Outline
8-5/32 inches
4-1/8 inches
18-1/8 inches 22-7/16 inches
ART COOL MIRROR INDOOR UNITS
Installation and Best Layout Practices
Hanging the Indoor Unit Chassis
1. Attach the three (3) hooks on the top of the indoor unit to the top edge of
the installation plate. Verify the hooks are properly attached to the instal-
lation plate by gently shaking the indoor unit from side to side.
2. Unlock the tubing clamp from the indoor unit frame. For easier access be-
tween the bottom of the indoor unit and the wall, prop the clamp between
the indoor unit frame and installation plate.
3. Remove the screw covers at the bottom of the indoor unit, unscrew the
two (2) screws, remove the frame cover, remove the piping connection
cover, and position the piping for installation (down, back, left, or right).
Installation plate
Figure 13:Locking the Indoor Unit onto the Installation Plate.
Tubing Clamp
Figure 14:Accessing the Back of the Indoor Unit.
Right
Tubing Clamp
Down
Left
Back
Frame Cover
Figure 15:Removing the Frame Cover.
Figure 16:Exterior Back View of Indoor Unit. Figure 17:Piping Installed to the Left.
Figure 18:Piping Installed to the Right.
Connecting
pipe
Tape
Drain hose
Connecting
pipe
Tape
Drain hose
Drilling Piping Hole in the Wall
Use caution when drilling holes through walls. Drilling into power wiring in the wall can cause serious
bodily injury or death.
Follow the left or right piping clearance recommendations.
1. Using a 2-5/8 (ø 65mm) inch hole core drill bit, drill a hole at either the right or left side of the
wall mounting. The hole must slant 3/16” to 5/16” from level (upward on the indoor unit side and
downward on the outdoor unit side).
2. Finish off the newly drilled hole as shown with bushing and sleeve covering. Sleeve and bush-
ing prevents damage to the tubing/bundling of the piping.
(3/16"~5/16")
Indoor
WALL
Outdoor
Bushing
Core Drill
Sleeve
Figure 19:Drilling Piping Hole
ART COOL MIRROR | 23
Art Cool Mirror™
Due to our policy of continuous product innovation, some specications may change without notication.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
MULTI
F
MAX
MULTI
F
Loading ...
Loading ...
Loading ...