LG Electronics LQN120HV4 LG Air Conditioner Cooling Area, Adjustable Air Direction

User Manual - Page 172

For LQN120HV4.

PDF File Manual, 243 pages, Read Online | Download pdf file

LQN120HV4 photo
Loading ...
Loading ...
Loading ...
Horizontal Installation
Units must be installed so that the access panels face to the side,
not facing up or down.
Installation must be in accordance with all relevant building codes,
which will necessitate the installation of an external condensate
pan (position the unit in or above the external condensate pan).
If the units are going to be suspended, use angled steel support
brackets with threaded rods to provide support from the bottom.
The brackets / threaded rods must be comparatively bigger / longer
than the unit, and each must be centered on the part of the frame
it supports.
If the unit will not be suspended, still use angled steel support
brackets, but also add vibration isolators (field supplied) to avoid
sound transmission. If necessary, provide the installing contractor
with an illustration of where the vibration isolator must be added
and how it must be positioned.
Unit must be positioned properly for plenum / duct installation.
Plenum must be strong and secure enough to support the installa-
tion of adapter collars to accommodate duct work.
To ensure proper drainage for horizontal installations, unit must be installed within ±1/8 inches level of the unit’s length and width.
Vertical-Horizontal Air Handling Units can be installed in a choice of vertical (upow) or horizontal (left side) congurations.
Vertical (Upflow) Installation
Unit must be positioned properly for plenum / duct installation.
To maintain proper air flow, minimum height clearance is 14 inches.
Plenum must be strong and secure enough to support the installation of adapter collars to accommo-
date duct work.
Air handler platform must be sturdy enough to support the frame, plus any accessories (e.g., filter box).
To prevent air leaks, seal all duct work according to local codes, but make sure that filter access is still
unobstructed.
Vibration isolators (field supplied) must be installed between the unit frame and the platform. If neces-
sary, provide the installing contractor with an illustration of where the vibration isolator must be added
and how it must be positioned.
Do not install the screws on the front and back of the unit, doing so will block lter installation.
Use > 6 Screws (M4*25L)
Field Supplied
Return Air Duct /
Plenum
>1 inch
Field Supplied
Supply Air Duct
Figure 224:Vertical Installation /
Attaching the Bottom Duct.
B
A
C
>1-1/2 inch x 1-1/2 inch Angle
Recommended length >26 inches
with a 2-inch clearance on both
sides of the unit
>3/8 inch Threaded Rod
Field-Supplied
Supply Air Duct
Field Supplied
Return Air Duct / Plenum
Suspension Bolt Locations
Capacity
(Btu/h)
Dimensions (inches)
A B C
24,000
4 23 41-11/32
36,000
Figure 225:Horizontal Installation.
Table 92:Bracket / Bolt Position Dimensions.
TWO-WAY VAHU INDOOR UNITS
Installation and Best Layout Practices
Due to our policy of continuous product innovation, some specications may change without notication.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
172 | VERTICAL-HORIZONTAL
Multi F and Multi F MAX Indoor Unit Engineering Manual
MULTI
F
MAX
MULTI
F
Loading ...
Loading ...
Loading ...