American Outdoor Grill 24PGL 24 Inch Stainless Steel In-Ground Grill

User Manual - Page 17

For 24PGL.

PDF File Manual, 40 pages, Read Online | Download pdf file

24PGL photo
Loading ...
Loading ...
Loading ...
17
Fig. 17-3 Post base option
INSTALLATION
It is not required to remove the control panel or knobs
to install this unit.
DO NOT lift the unit from the control panel when installing.
PREPARE FOR INSTALLATION
Consult a qualified professional installer.
The flex connector can be routed out the back of the post,
under the post base, or inside the post. The power supply
cord is to be routed out the back.
To gain access to the inside of the post, unscrew and carefully
open the access plate on the rear of the post using a medium
Phillips-head screwdriver. Retain the screws.
A power supply is pre-mounted to the access plate. For
ease of installation, disconnect the converter harness from
the power supply. Locate the wires coming from the inside of
the post to the power supply and carefully disconnect (see
Fig. 17-1 and 17-2).
Important: Pull from the connectors (not the wires).
ROUTE POWER SUPPLY CORD
The power cord will need to be routed through the access plate
for later connection to a 120VAC (15 AMP minimum) GFCI
GROUNDED 3-wire receptacle. The GFCI receptacle must
be a WEATHER-PROOF IN-USE COVERED RECEPTACLE.
1. Remove the knock-out disc at the bottom left of the
access plate with a large flathead screwdriver. (Insert
the screwdriver into the notch provided in the center of
the knock-out.)
2. Remove the plastic power cord bushing attached to the
power cord.
3. Feed the power cord through the newly created hole.
4. Install the bushing onto the power cord and slide the
bushing up against the access plate knock-out hole and
snap into place. See Fig. 17-1.
ROUTE FLEX CONNECTOR
The gas supply line will need to be run to the post install
location as appropriate for the desired setup.
To route flex connector through rear of post:
1. Remove the knock-out disk at the bottom right of the
access plate with a large flathead screwdriver. (Insert
the screwdriver into the notch provided in the center of
the knock-out.)
2. Remove the plastic grommet (attached to the flex
connector) and insert it into the newly created opening.
Then route the flex connector through the opening. See
Fig. 17-1 and 17-2.
To route flex connector beneath post base:
Route the flex connector through the hole found beneath the
center of the post base (see Fig. 17-3).
PATIO MOUNT INSTALLATION
Fig. 17-1 Access plate view & install orientation
Access
plate
Gas supply
knock-out
(optional)
Power cord
knock-out
Power
supply
Fig. 17-2 Post interior detail
Back of
timer
valve
Flex connector
(w/ flare-to-NPT
adapter)
Flex
connector
(w/ flare-to-
NPT adapter)
AC/DC
converter
harness
Regulator
Wire
Connections
AC/DC converter
harness
Loading ...
Loading ...
Loading ...