Briggs & Stratton 040684 Power Protect 10kW Home Standby Generator

Installation and Operation Manual - Page 21

For 040684.

PDF File Manual, 180 pages, Read Online | Download pdf file

040684 photo
Loading ...
Loading ...
Loading ...
21
Fuel Conversion
The engine of your home generator system is factory
Calibrated and set to operate on natural gas (NG). It may
also be operated on liquefied petroleum (LP) vapor.
To configure 10 kW units with factory installed fuel
harness for LP use:
1. Press control panel OFF button.
2. Remove 15 Amp fuse from control panel.
3. Remove Roof.
4. Using a slotted screwdriver turn both (C) and (D)
screws clockwise until it is snug (Over tightening
can damage mixer port)
5. Using screwdriver turn screw (C) counter clockwise
2 and ½ turns.
6. Leave screw (D) seated.
7. Connect the fuel harness (A) to the engine
solenoid (B) by joining the two-pin electrical
connectors.
8. Reinstall 15 Amp fuse in control panel.
9. Press control panel AUTO button.
10. Reinstall Roof and Close access panels.
NOTE: NG Settings from factory:
Screw C: 4 - 4.5 turns
Screw D: 1.5 - 2 turn
The system is now ready to operate automatically using
LP vapor fuel.
A
B
D
C
To configure 10 kW units without factory installed fuel
harness for LP use:
1. Press control panel OFF button.
2. Remove 15 Amp fuse from control panel.
3. Remove Roof.
4. Using a slotted screwdriver turn both (C) and (D)
screws clockwise until it is snug (Over tightening
can damage mixer port)
5. Using screwdriver turn screw (C) counter clockwise
2 and ½ turns.
6. Leave screw (D) seated.
7. Reinstall 15 Amp fuse in control panel.
8. Press control panel AUTO button.
9. Reinstall Roof and Close access panels.
Not for
Reproduction
Loading ...
Loading ...
Loading ...