Weil-McLain ULTRA S4 GAS BOILER UG-105 Ultra S4 Gas Boiler Ug80 Ultra S4 Residential Gas Water Boiler

User Manual - Page 81

For ULTRA S4 GAS BOILER UG-105.

PDF File Manual, 140 pages, Read Online | Download pdf file

ULTRA S4 GAS BOILER UG-105 photo
Loading ...
Loading ...
Loading ...
Part number 550-100-400/0119
81
฀
®
Series 4
gas-fired water boiler — Boiler Manual
DIRECT VENT: Vertical vent / sidewall air (continued)
Multiple air terminations
1. When terminating multiple Ultra boiler air connections, terminate
each air connection as described in this manual.
2. Place wall penetrations to obtain minimum clearances as instructed
in this manual.
3. Place adjacent air inlets for multiple Ultra boilers at least 6 inches
apart.
4. For Canadian installations, provide clearances required by CSA
B149.1 or B149.2 Installation Code.
5. Combustion air (NOT vent piping) can be manifolded as shown
in the Ultra boiler manual.
Prepare wall penetrations
1. Air pipe penetration:
a. Cut a hole for the air pipe. Size the air pipe hole as close as
desired to the air pipe outside diameter.
2. Seal exterior openings thoroughly with exterior caulk.
Termination and fi ttings
1. Prepare the air termination elbow ( Figure 93 ) by inserting a bird
screen. Bird screens must be purchased separately. See the parts
list at the end of this manual for part numbers.
2. Use metal plates (by installer) at inside and ouside penetrations
as shown in Figure 94 .
If extending the air pipe out from the wall, install a cou-
pling on each pipe. Mount the piping with the coupling
ush with the outer plate.
Connecting from air termination to boiler
1. Install the terminations as instructed in the following. Then pro-
ceed to page 82 to complete the air and vent piping between the
termination and the boiler.
Figure 94 Sideall air inlet installation for direct ent
ertical ent  sideall air
1 Air piping
2 Sidewall plates, by installer
3 Bird screen (air), by installer
4 Air inlet elbow
Loading ...
Loading ...
Loading ...