Loading ...
Loading ...
Loading ...
Part number 550-100-400/0119
25
®
Series 4
gas-fired water boiler — Boiler Manual
DIRECT VENT
Figure 24DIRECT VENT
DIRECT VENT
SIDEWALL termination
DIRECT VENT
VERTICAL termination
DIRECT VENT
VERTICAL vent and
SIDEWALL air
6CX
7&/5
"*3
674CX
7&/5
"*3
Step 1 Install the boiler.
Step 2 Determine the termination method — sidewall or vertical, concentric or separate pipes, etc.
Step 3 Determine proper location for wall or roof penetration for each termination.
Step 4 Install termination assembly as described in this manual.
Step 5 Install air and vent piping from boiler to termination.
Step 6 Install pipe supports and brackets as required.
Loading ...
Loading ...
Loading ...