Loading ...
Loading ...
Loading ...
11
INSTALL UPPER FLUE MOUNTING
BRACKET
1 If a framing member is not present, drill two
5
/16" diameter
holes where shown. Insert drywall anchors into the holes.
2 Center the bracket over the hood location and ush with the
ceiling. Make sure that the slots of the upper ue bracket are
at the bottom. Secure the upper ue bracket to the wall using
(2) no. 8 x 1½" mounting screws.
3 Tighten the screws completely. Make sure that the bracket
is tight against the wall.
C
L
HD1175
CENTER OF INSTALLATION
RECOMMENDED
DISTANCE BETWEEN
SCREW HOLES
CEILING
Ø 5 / 16 " T Y P.
2½"
"
C
L
HD1176
CENTER OF INSTALLATION
UPPER FLUE MOUNTING
BRACKET SLOTS
CEILING
FLUSH WITH
THE CEILING
INSTALL THE HOOD (HORIZONTALLY
DUCTED HOODS ONLY)
1 DO NOT REMOVE the protective plastic lm covering the
decorative ue and the hood at this time.
2 Lay the back side of the hood at on a table. Use a piece of
cardboard to avoid damaging the table or the hood.
3 Remove the grease lters by pulling down the metal latch
tab and tilting lters downward to remove.
4 Carefully rotate hood upright.
14¼”
MAX.
LOWER FLUE
MOUNTING BRACKET
HD1222A
INSTALLATION INSTRUCTIONS
5 To make sure there will be adequate clearance between top
of hood and lower ue mounting bracket for ductwork: Elbow
must be located below lower ue mounting bracket.
6 Align the hood and center it above the hood mounting
bracket. Gently lower the hood until it securely engages the
bracket.
HD1223
SIDE VIEW
INSIDE BACK OF HOOD
MOTOR / BLOWER
ASSEMBLY
HOLES LOCATION Ø 5 /16 " T Y P.
7 With the hood hanging in place, drill through both holes
located in the inside lower back of hood using a
5
/16" drill
bit. Insert the included drywall anchors into the drilled holes
(one for each hole). Install (2) washers and (2) no. 8 x 1½"
mounting screws through the hood back and into the drywall
anchors. Verify that the hood is centered and leveled. Tighten
all screws completely.
8 Reinstall grease lters by aligning rear lter tabs with slots
in the hood. Pull down the metal latch tab, push lter into
position and release. Make sure lters are securely engaged
after installation.
HJ0226
6" ROUND
DUCT BELOW
9 Measure and install 6" round steel ductwork to roof cap or
wall cap and 9elbow over the blower exhaust opening
on top of hood. Use duct tape to make all joints secure and
air tight.
Loading ...
Loading ...
Loading ...