Loading ...
Loading ...
Loading ...
Rinnai Australia 24 Energysaver® - Operation & Installation Manual
For Commissioning Instructions, refer to the Commission sheet attached behind the front panel of the
appliance.
Use a soapy solution to test all gas connections. If a leak is present bubbles will
form at the leak point. When finished remove any residue with a rag. Prevent any
soapy solution from coming in contact with electrical components.
14.Fit left and right cover panels to the rear of the appliance by clipping the panels onto the location
tabs then fastening into position using the two 6g x 8mm pan head screws supplied. Screws locate
into pre-drilled and formed recesses at the bottom edge of the panels
15.Remove the Fan Filter and carefully fit the top cover panel ensuring the rear fold locates neatly
between the two securing brackets and wall.
16.Secure the top cover panel with two 6g x 8mm pan head screws supplied or suitable equivalent.
17.Replace the Fan Filter.
Air hose and heater exhaust connections at the Energysaver
®
heater MUST be
made and check in accordance with these instructions. Improper connections may
result in dangerous situations, for example, the dispersion of combustion
products in the space being heated.
CAUTION
CAUTION
HEATER INSTALLATION
COMMISSIONING
Loading ...
Loading ...
Loading ...