Loading ...
Loading ...
Loading ...
Moisture Plus
63
The prompt to draw in water appears.
Preparing and starting the water
intake process
Fill a suitable container with the
required amount of fresh tap water.
Open the door.
Pull the water intake pipe forwards
(located below the control panel on
the left).
Immerse the end of the water intake
pipe in the container with tap water.
Confirm with OK.
The intake process will begin.
The amount of water actually drawn up
into the oven may be less than the
amount specified as required, leaving a
small amount in the container.
The intake process can be interrupted
and restarted at any time by selecting
Stop or Start.
Remove the water container after the
water intake process and close the
door.
The sound of the pump running can be
heard again briefly. Residual water in
the water intake pipe is being drawn
into the oven.
The oven heating and cooling fan will
switch on. The required and the actual
temperature will appear.
You will see the temperature rising in
the display. A buzzer will sound when
the selected temperature is reached for
the first time.
If you have selected with Timer, you
can check the time before steam is
released by selecting  Info.
Loading ...
Loading ...
Loading ...