Binder KBF-S 720 Humidity Test Chamber

User Manual - Page 23

For KBF-S 720.

PDF File Manual, 91 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
KBF-S / KBF-S-UL (E6) 02/2019 page 23/91
For detailed information on operating the water treatment system BINDER Pure Aqua Ser-
vice and its function, please refer to the operating manual supplied with BINDER Pure Aqua
Service.
4.1.3 Installation of freshwater supply
To install the freshwater can proceed in the following order:
1. Fill the freshwater can.
As long as no hose is connected to the tap of the freshwater can, the tap must
be closed
Observe water quality and temperature (chap. 4.1.1).
For refilling later, you can remove the freshwater can from the support
or fill it
on site with a suitable aid (water hose, watering can). When filling on site, the
existing hose connection can remain on the freshwater can.
Figure 8: Freshwater can with closed tap
2. Establish the hose connection to the freshwater can
The freshwater hose (2 mm wall thickness) is firmly connected to the chamber. Attach the free hose
end to the connection of the freshwater can and secure it at the top and bottom with the 2 supplied
hose clamps.
3. Attach the can support mounting plate at the left side of the climatic chamber
Loosen 4 screws on the
chamber’s rear panel,
attach the can support
mounting plate and tighten
the screws again.
Screws
Figure 9: Attaching the
can support mounting
plate
4. Attach the can support to the can support mounting plate
Insert the four hooks of the can support into
the provided eyelets of the can support holder
Figure 10: Attaching the can support to the
can support mounting plate
Loading ...
Loading ...
Loading ...