Loading ...
Loading ...
Loading ...
34
can optimize the signal path and make measurement more accurate. If the temperature changes 10℃ or above, this
program must run to ensure the measurement accuracy.
Probe compensation may be conducted in the following steps:
1) First, connect the oscilloscope probe to CH1. If a hook head is used, make sure that it is in good connection
with the probe.
2) Connect the probe to the calibration output signal terminal and connect the probe ground to the ground
terminal. As shown in Figure 2-13.
Loading ...
Loading ...
Loading ...