Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/2135910-24bl59m5766/bga.png)
10 se c t i O n 3— as s e M b l y & se t -up
NOTE: Approved fluids include Shell Tellus® S2 M
recommended that fluids be mixed, to top off the reservoir
Fluid only.
Replace the vented dipstick securely, tightening it until the
top of the threads are flush with top of the pipe.
Disconnect the spark plug and prime the pump by pulling the 5.
Reconnect the spark plug wire and start the engine
Use the control handle to engage the wedge to the farthest 7.
extended position. Then retract the wedge.
Refill the tank as specified on the dipstick if necessary8.
NOTE:
warranty.
remove any trapped air in the system (the system is “self-
Refill the reservoir within the range marked on the dipstick
if necessary.
NOTE: Some fluid may overflow from the vent plug as
the system builds heat and the fluid expands and seeks a
balanced level.
Tire Pressure
The max recommended operating pressure is 30 psi. Do
recommended psi. Maintain equal pressure in both tires.
Excessive pressure when seating beads
may cause tire/rim assembly to burst with force
sufficient to cause serious injury.
Loading ...
Loading ...
Loading ...