Renogy MONITORING SCREEN for 12V 30/50A DC MPPT on-board Battery Charger, Flush-mount with Backlit LCD, Real-time Tracking

User Manual - Page 8

For MONITORING SCREEN. Series: DC-DC MPPT Battery Charger Series

PDF File Manual, 36 pages, Read Online | Download pdf file

MONITORING SCREEN photo
Loading ...
Loading ...
Loading ...
07
NOTE
Before installation, check to make sure the power is working
properly. Resolve any issues before installation of monitoring
screen and cable.
The following are recommendations for installation. There will be
multiple mounting methods depending on user’s applications.
Clearance of at least 2 inches (50 mm) behind the unit is recommend-
ed to allow for the bending radius of the RJ45 Communication Cable
that connects to the monitoring screen.
The RMS-DCDC requires a flush mount installation. The RMS-DC-
DC’s faceplate will be flush with the mounting surface and the
body of the meter.
Before the installation of the monitoring screen, it is recommended
to have the following tools available:
CAUTION
Installation
Before drilling, make sure there are no electrical component or
other obstacles that may interfere with installation on the other
side of the mounting surface.
WARNING
Preparation
Choosing an Installation Location
Pencil
Drill
Jigsaw
Phillips screwdriver
Loading ...
Loading ...
Loading ...