Breville VCF126 Barista Max Espresso Machine | Latte & Cappuccino Coffee Maker

User Manual - Page 9

For VCF126.

PDF File Manual, 42 pages, Read Online | Download pdf file

VCF126 photo
Loading ...
Loading ...
Loading ...
9
Step 6. Preparing to Prime Machine
Important: This priming step must be
completed prior to first use.
Fill Water Reservoir
- Open the Lid and lift upwards using the
Handle inside.
- Fill with cold water from the tap.
- Insert the Water Reservoir into position
& close the Lid.
Note: Make sure that the Water Reservoir
is clean & free of any debris, as any fine
particles can block the water flow.
• Power
- Ensure that the Steam
& Hot Water
DIAL is in the vertical position.
- Insert the Power Plug into a 230-240V
AC power outlet & switch the power on.
- Press the BUTTON to turn on the
machine.
- The LIGHT will illuminate & pulse to
indicate the Thermoblock is heating up.
- The GRINDER LIGHT will be fully
illuminated from turn on.
- When the , EXTRACTION
BUTTONS & DIAL LIGHTS are all
fully illuminated, the machine is in the
READY state for EXTRACTION & DIAL
features.
Insert Group Handle
- Insert the Two Cup Filter Basket in the
Group Handle.
- Align the Group Handle with the
'INSERT' position located on the left of
the Group Head.
- Insert the Group Handle flat against
the Group Head, then turn the Group
Handle right all the way to the centre
position.
Note: Turning the Group Handle to the
centre position might be tight for the first
few uses.
Step 7. Prime Espresso Machine
- Press the BUTTON & water
should start flowing from the Group
Head.
- Allow water to run through until it stops.
- The machine will return to the READY
state.
Note: For the first few seconds the
Pump will make a louder than usual
noise as it begins pumping the water
through.
- Position Steam Wand over the Drip
Tray.
- Turn DIAL to .
- Allow water to run through for 20 sec.
- Return DIAL to vertical position.
- The machine will return to the READY
state.
- Now the Espresso Machine should be
thoroughly primed.
- Wash Group Handle & Filter Basket in
warm water & dry before making your
first coffee.
- If water is not flowing from the Group
Head or Steam Wand, repeat Step 7.
- If water is still not running through,
contact Breville Customer Care. Details
are on the back page.
MAX
2.8L
1L
MIN
MAX
2.8L
1L
MIN
BEFORE FIRST USE OF THE BARISTA MAX
READY
THERMOBLOCK
58MM CAFÉ GROUP HEAD
CENTRE
INSERT
INSERT
2.TURN
1. ALIGN
& INSERT
Loading ...
Loading ...
Loading ...