V-Tac SUN-8K-SG01LP1-EU 8kW On/Off Grid Hybrid Solar Inverter

INSTRUCTION MANUAL - Page 41

For SUN-8K-SG01LP1-EU.

PDF File Manual, 50 pages, Read Online | Download pdf file

SUN-8K-SG01LP1-EU photo
Loading ...
Loading ...
Loading ...
7. Fault information and processing
The energy storage inverter is designed according to the grid-connected operation standard
and meets the safety requirements and electromagnetic compatibility requirements. Before
leaving the factory, the inverter undergoes several rigorous tests to ensure that the inverter
can operate reliably.
1. Inverter serial number;
2. Distributor or service center of the inverter ;
3. On-grid power generation date;
4. The problem description (including the fault code and indicator status displayed on the LCD)
is as detailed as possible.
5. Your contact information.In order to give you a clearer understanding of the inverter's fault
information, we will list all possible fault codes and their descriptions when the inverter is not
working properly.
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the battery bank or grid according to the settings.
The last power backup will be the Generator if it is available.
If any of the fault messages listed in Table 7-1 appear on your inverter and the
fault has not been removed aer restarting, please contact your local dealer or
service center. You need to have the following information ready.
On-Load+AC couple
AC cable DC cable
CT
Battery
Solar
Grid
Backup Load
On-Grid Home Load
On-Grid Inverter
Smart Load
On-Grid+AC couple
AC cable DC cable
CT
Battery
Solar
Grid
Backup Load
On-Grid Home Load
On-Grid Inverter
Smart Load
Loading ...
Loading ...
Loading ...