V-Tac SUN-8K-SG01LP1-EU 8kW On/Off Grid Hybrid Solar Inverter

INSTRUCTION MANUAL - Page 11

For SUN-8K-SG01LP1-EU.

PDF File Manual, 50 pages, Read Online | Download pdf file

SUN-8K-SG01LP1-EU photo
Loading ...
Loading ...
Loading ...
3.3.2 Function port definition
Batt Temp
Sensor
1 2 3 4 5 6 7 8 9 10
RS 485
Meter_CON Parallel_A Parallel_B
CAN
TEMP (1,2): battery temperature sensor for
lead acid battery.
CT-L1 (3,4): current transformer (CT1) for
“zero export to CT”mode clamps
on L1 when in split phase system.
CT-L2 (5,6): current transformer (CT2) for
“zero export to CT”mode clamps
on L2 when in split phase system.
G-start (7,8): dry contact signal for startup
the diesel generator.
When the "GEN signal" is active, the open
contact (GS) will switch on (no voltage output).
G-valve (9,10): reserved.
RSD (11,12): provide 12Vdc output when
inverter is on.
ATS: 230V output port when inverter is on
Note: For - EU model (7.6/8kW,230V@50Hz),
1pcs CT is needed only, and the secondary
side of the CT should be connected to
5&6 port (CT-L2).
CT -L1
CT -L2
Gen start-up
N/O Relay
Neutral
Earth
Bond
240V Coil
3.3.2 Function port definition
3.3.2 Function port definition
Inverter
RS 485
RS 485
11 12 ATS
GS (diesel generator startup signal)
relay
coil
open
contact
G S
RS 485: RS 485 port for battery
communication.
CAN: CAN port for battery
communication.
Parallel A: Parallel communication port 1
(CAN interface).
Parallel B: Parallel communication port 2
(CAN interface).
*Meter_CON: for energy meter communication.
*Some hardware versions don't
have this port.
Loading ...
Loading ...
Loading ...