Loading ...
Loading ...
Loading ...
Installation
*INSTALLATION*
114
–Connecting the stainless steel hose
to the refrigeration appliance
Pull the cover off the thread of the
solenoid valve.
Push the nut over the angled end
of the hose as far as it will go,
holding the nut securely.
Moisten the seal, then press the
seal into the nut.
The seal should lie flush with the angled
end of the hose and be held lightly in
position.
Take care not to damage the
thread of the solenoid valve.
There is a risk of damaging the
threads beyond repair.
Position the nut straight on the
thread and screw it carefully into
place.
Tip: Lay out the straight end of the hose
on the floor to the left of the appliance.
Use two fingers to position the nut
straight on the thread of the solenoid
valve and screw it carefully into place.
Tighten the nut with the tool sup-
plied by turning it clockwise until
the maximum torque is reached and
the tool is over-torqued.
–Connecting the stainless steel hose
to the stopcock
Unscrew the safety cap from the
nut on the straight end of the hose.
Connect this nut using the tool
supplied to the stopcock. Tighten
the nut by turning it clockwise until
the maximum torque is reached and
the tool is over-torqued.
–Checking the mains water connec-
tion
Open the stopcock and switch the
ice cube maker on (see “Selecting
further settings” – “Switching the ice
cube maker on and off”) as soon as
the refrigeration appliance has been
connected to the electricity supply.
Check the entire water system for
leaks.
Fold the tab on the toolin and
secure the tool to the stainless steel
hose for safe-keeping.
Loading ...
Loading ...
Loading ...