This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor.
See accessories to order speci c kits required.
A. Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1" (25mm)
clearance between the vent pipe and any combustible material. Try to
center the vent pipe location midway between two joists to prevent
having to cut them. Use a plumb bob to line up the center of the
openings. A vent pipe shield will prevent any materials such as
insulation, from lling up the 1" (25mm) air space around the pipe.
Nail headers between the joist for extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the Wolf Steel
vent pipe shield plate or equivalent (in the case of a nished ceiling), and secure
over the opening in the ceiling. A restop must be placed on the bottom of each
framed opening in a roof or ceiling that the venting system passes through.
Apply a bead of caulking all around and place a restop spacer over the vent
shield to restrict cold air from being drawn into the room or around the replace. Ensure
that both spacer and shield maintain the required clearance to combustibles. Once the
vent pipe is installed in its nal position, apply sealant between the pipe and the restop
assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from lling up the 1" (25mm)
air space around the pipe.
21.1A
CAULKING
VENT PIPE
SHIELD
FIRESTOP
UNDERSIDE OF
JOIST
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
This application occurs when venting through an exterior wall.
Having determined the correct height for the air terminal
location, cut and frame a hole in the exterior wall as
illustrated to accommodate the restop assembly. Dry
t the restop assembly before proceeding to ensure
the brackets on the rear surface t to the inside
surface of the horizontal framing.
The vent shield must be installed to the full depth of
the combustible wall. The length of the vent shield
may be cut shorter for combustible walls that are less
than 6" (152mm) thick. NOTE: Bend the tabs for reduced side
clearances or move the shield for reduced top clearances.
A. Apply a bead of caulking (not
supplied) around the corner
edge of the inside surface of the
restop assembly, t the restop
assembly to the hole and secure
using the 4 screws (supplied in
your manual baggie).
B. Once the vent pipe is installed in its nal position, apply high temperature sealant W573-0007 (not
supplied) between the pipe and the restop.
DETERMINE
THE
CORRECT
HEIGHT
CAULKING
FIRESTOP
SPACER
VENT
SHIELD
FINISHING
MATERIAL
20.7A
!
WARNING
THE FIRESTOP ASSEMBLY MUST BE INSTALLED WITH THE VENT SHIELD TO THE TOP.
TERMINALS MUST NOT BE RECESSED INTO A WALL OR SIDING MORE THAN THE DEPTH OF THE
RETURN FLANGE OF THE MOUNTING PLATE.
4.1.1 HORIZONTAL INSTALLATION
4.1.2 VERTICAL INSTALLATION