Loading ...
Loading ...
Loading ...
The length of pipe or tubing should be measured from the gas meter or propane second stage
regulator.
f//_GAS SUPPLY
PIPING
SHUT-OFF
VALVE
TRAP
GROUND JOINT
UNION
FIGURE 12 GAS PIPING
WARNING
TURN OFF ELECTRICAL POWER AT FUSE BOX BEFORE MAKING ANY LINE
VOLTAGE CONNECTIONS. FOLLOW LOCAL ELECTRICAL CODES.
All electrical work must conform to local codes as well as the National Electrical Code, ANSI/NFPA-
70, latest revision. In Canada, electrical wiring shall comply with the Canadian Electrical Codes,
CSA-C22.1 and .2.
A. ELECTRIC POWER SUPPLY
Prior to making any line voltage connections, service switch at boiler should be in the off position
and the power turned off at the fuse box.
Run a separate 120 volt circuit from a separate over current protection device in the electrical
service entrance panel. This should be a 15 ampere circuit. A service switch has been pre-wired
and located on the exterior boiler jacket. See Fig.13 for diagram showing location of service
27
Loading ...
Loading ...
Loading ...